• Improved ore recovery - Post splitting perimeter of the stope with WebGen™ ensures full extraction of ore from the stope​.
  • Improved safety - Pre-charging with WebGen™ eliminates the need to work near the open stope or brow at the middle and upper levels of the stope.
  • Maximise free bogging - By pre-charging holes with WebGen™ primers. rings can be continually fired, optimising drawpoint availability and enabling a reduction in the use of tele-remote bogging​.

Solutions

webgen-solution-block-cave-drawbell-undercut
Block Cave - Drawbell & Undercut​
Reduce cycle times by pre-charging rings with WebGen™. Eliminate the need for rill stabilisation and redrilling​
Learn more
webgen-solution-hangup
Block Cave - Hang-Up Blasting
Reduce exposure time to drawpoints and wet muck hazards. Tele-remote solution reduce production delays and increase drawpoint availability.
webgen-solution-precondition
Block Cave - Pre-Conditioning
Reduce complexity of the drill and blast process, remove people from hazardous areas and complete mining cycle faster.
webgen-solution-opencut
Open Cut
Reduce complexity on bench and eliminate wire related misfires. Enabling new and better ways of mining in steeply dipping coal seams or multi tier applications in hard rock.​
webgen-solution-stranded-pillar
Stranded Pillar Recovery
Pillar extraction is high cost and resource heavy. Reduce extraction costs up to 75% using wireless technology.​
webgen-solution-sub-level-caves
Sub Level Caves
By pre-charging blast holes WebGen™ offers a significantly safer solution at SLC operations, reducing exposure of personnel at the brow and the opportunity move more material per shift lowering overall cost per tonne.
webgen-solution-snope
Sub Level Open Stope
Aggregating charging events will minimise re-entry to the stope, reduce dilution, maximise free bogging and increase the speed of stope turnover.
webgen-solution-temp-pillar
Temporary Pillar Recovery​
Revolutionary mining method to extract ore pillars that previously could not be recovered. Using WebGen™ the inaccessible pillars can be blasted, reducing dilution by >30% and increasing truck fill factors.​

Contact

*Mandatory fields

 

Mandatory field(s) marked with *