webgen-solution-sub-level-caves
Sub Level Caves
By pre-charging blast holes WebGen™ offers a significantly safer solution at SLC operations, reducing exposure of personnel at the brow and the opportunity move more material per shift lowering overall cost per tonne.
Explore
webgen-solution-snope
Sub Level Open Stope
Aggregating charging events will minimise re-entry to the stope, reduce dilution, maximise free bogging and increase the speed of stope turnover.
Explore
webgen-solution-block-cave-drawbell-undercut
Block Cave - Drawbell & Undercut​
Reduce cycle times by pre-charging rings with WebGen™. Eliminate the need for rill stabilisation and redrilling​
Explore
webgen-solution-precondition
Block Cave - Pre-Conditioning
Reduce complexity of the drill and blast process, remove people from hazardous areas and complete mining cycle faster.
Explore
webgen-solution-hangup
Block Cave - Hang-Up Blasting
Reduce exposure time to drawpoints and wet muck hazards. Tele-remote solution reduce production delays and increase drawpoint availability.
Explore
webgen-solution-temp-pillar
Temporary Pillar Recovery​
Revolutionary mining method to extract ore pillars that previously could not be recovered. Using WebGen™ the inaccessible pillars can be blasted, reducing dilution by >30% and increasing truck fill factors.​
Explore
webgen-solution-stranded-pillar
Stranded Pillar Recovery
Pillar extraction is high cost and resource heavy. Reduce extraction costs up to 75% using wireless technology.​
Explore
Prev

Customer Stories

Rob Cunningham
Mining Operations Manager
Northparkes Mines

View Customer Story

Customer Stories

Katja Sahala
Mine Planning Engineer
FQM Pyhäsalmi

View Customer Story

Customer Stories

Rob Cunningham
Mining Operations Manager
CMOC Northparkes

View Customer Story

Customer Stories

Tim Purvis​​
Underground Production Mining Engineer​
Ernest Henry Mining Glencore

View Customer Story

Customer Stories

Billy Grace ​​
Chief Engineer
Newmont Goldcorp Musselwhite​

View Customer Story

Next

Contact

*Mandatory fields

 

Mandatory field(s) marked with *

Resources

WebGen™ Online Learning Series – Reduce risks in ore extraction for underground mass mining This link will open in a new window

WebGen™ Online Learning Series – Reduce risks in ore extraction for underground mass mining
Re-imagine a new mining landscape with new approaches that are enabled by WebGen™ wir ...

Read more

WebGen™ Online Learning Series – Underground stoping operations with WebGen™ wireless technology This link will open in a new window

WebGen™ Online Learning Series – Underground stoping operations with WebGen™ wireless technology
Safety, productivity, ore recovery and dilution control are critical to success ...

Read more

Temporary Rib Pillar Method This link will open in a new window

Temporary Rib Pillar Animation
Temporary pillars are pre-charged with WebGen™ to hold back the waste rock back fill in mining methods like modified AVOCA​.

Read more

Block Cave - Hang-up Blasting This link will open in a new window

Block Cave - Hang-up Blasting
Discover how WebGen™ reduces production delays, exposure time to drawpoints and wet muck hazards and increase drawpoint availability.

Read more