Video thumbnail

Iron Ore

Mine schedule flexibility

Improve efficiencies in your mining process and enhance productivity for your iron ore operation with greater mine schedule flexibility enabled by WebGen™.

WebGen wireless electronic blasting system full colour logo

Mine schedule flexibility.

Greater mine schedule flexibility is now achievable through Orica’s WebGen™ wireless initiating system. By eliminating the need for downlines and surface wires, operations gain the ability to safely drive haul trucks and equipment over loaded blastholes, turning a WebGen™ loaded blast into a temporary haul road. This capability not only improves safety and operational continuity but also unlocks new design possibilities that accelerate vertical advance. Operations can maintain production momentum while reducing delays, enabling smarter sequencing and more efficient use of equipment. 

Benefits

Driven by innovation and backed by our global research, development and technical networks, we deliver solutions that solve real operational challenges. 

Improve safety

Improve safety

Blast quality and performance

Blast quality and performance

Mine flexibility and scheduling

Mine flexibility and scheduling

Maximise resource recovery

Maximise resource recovery

Operational efficiency and performance

Operational efficiency and performance

Reduce costs of drill and blast

Reduce costs of drill and blast

Additional benefits


Delivering value where it matters.

Discover the right solutions to help you run your operation safely and efficiently.
  • Improved safety
  • Increased productivity
  • Increased flexibility

Want to know more about this solution?

Contact an expert by completing the form.

Subscribe to our LinkedIn newsletter