

OIL AND GAS
In-hole stability
Solutions for project specific requirements.
Performance in extreme hole conditions.
Performance in extreme hole conditions.
In seismic explorations, E&P companies often require in-hole sustainability of up to 12 months. Seismic explosives are expected to perform in extreme hole conditions including high or low PH levels, angular gravel packing, transition zones or high-water tables. Orica meets these project specific requirements with:
- Advanced harsh pH environmental protections meet ASTM®* testing >12 months.
- Unique explosive shells and accessories to provide wire protection at vulnerable pinch points.
- Software solutions designed to provide quality control management from explosives loading to shooting.
- On-site training and QC management.
Solution powered by

Blasting Solutions
Seismic explosives
Orica’s seismic explosives deliver consistent energy, high water resistance and reliable performance for oil and gas geophysical exploration.

Blasting Solutions
Training
Site-specific training to improve safety, performance and technical capability.
Want to know more about this solution?
Want to know more about this solution?
Contact an expert by completing the form.
