Manage vibration, overpressure and flyrock

Poorly designed or executed cast blasts and presplits have a high potential to generate vibration, overpressure and flyrock. Careful blast design and planning, combined with prediction, measurement and reconciliation of results is the key to controlling and managing these outcomes and maintaining a good relationship with community and regulatory stakeholders.

Features and Benefits

Powered By

  • Customer Stories

    "Stevenson Group Drury Quarry is located close to neighbours, so adhering to local air overpressure and vibration limits is crucial for the quarry to maintain their licence to operate."

    Drury Quarry Stevenson Group

    View Customer Story

Resources

Contact

*Mandatory fields

 

Mandatory field(s) marked with *
  • SHOTPlus™
  • ENVIROTtrack™
  • Flexigel™
  • Electronic Blasting Systems - i-kon™ III
  • Total Load Service (TLS)
  • SHOTPlus Underground™
  • ENVIROTtrack™  - MonitorIQ