Underground development and tunnel blasting made simple

eDev™ II Electronic Blasting System makes easy work of underground development and tunnel blasting. Advance rates in challenging conditions and reduced overbreak can be achieved with the accurate and flexible electronic timing system. Blasts are tied-in and fired faster, reducing the time your crews spend at the face. Whether you are operating with soft or abrasive rock, we have a wire option to suit your needs.

Industry

  • Underground Construction
  • Underground Mining
  • Civil Infrastructure

Hole Conditions

  • Dry
  • Dewatered
  • Wet

Features and Benefits

System Configuration

  • eDev™ II Detonator
  • eDev™ II Scanner 125/260 Kit
  • eDev™ Blast Box 610S
  • Duplex harness wire
  • SHOTPlus™ Blast Design Software

eDev™ II Detonator

edev_2_detonator

Fully programable electronic detonator

eDev™ II Scanner 125/260 Kit

product_scanner

Assigns delay times to each detonator

eDev™ Blast Box 610S

blastbox_610

Controls the final blast data and fires the blast

Duplex harness wire

product_wire

Connects detonators with the blast box

SHOTPlus™ Blast Design Software

Digital_SHOTPlus_Thumb

Used to design the blast pattern

  • Customer Stories

    "Ultimately eDev II and the multi deck blasting technique enabled less blasts and subsequently our overall efficiency and rate of advance increased."

    Mr. Sueyoshi
    Deputy Project Manager
    Kajima Corporation

    View Customer Story

Resources

Contact

*Mandatory fields

 

Mandatory field(s) marked with *
  • Electronic Blasting Systems - eDev™ II